Transylvania Student Center

In partnership with SLAM, STW completed a study to provide recommendations and a phasing plan for a renovation and expansion of Transy’s Student Center. The existing facility, built in 1982, features a gymnasium, natatorium, racquetball courts, common study areas, meeting rooms, a dining hall, kitchen, and several office and conference areas. The new Campus Center […]
Scott County High School

The new Scott County High School was designed to replace the existing high school and become the second new high school for Scott County. The three-story school was built to accommodate 1,500 students and included an on-site athletic complex. SCHS offered numerous career and technical education programs, such as business, agriculture, and family and consumer […]
The Hub for Innovative Learning and Leadership

The HILL is a 172,000-square-foot adaptive reuse project in downtown Lexington. This building will consolidate the Southside and Eastside technical centers into one location. The HVAC systems utilize (200) two hundred, 500’ geothermal vertical bores tied into a central station dedicated outside air units with demand control ventilation and variable speed water source heat pumps. […]
ARH Tug Valley Operating Room Renovation

STW engineered the complete replacement of the HVAC equipment within the OR and OB spaces of the facility. Both spaces were also decoupled from each other, resulting in independent control of the OR space from the OB space. The facility was also fitted with new variable-air-volume (VAV) boxes in these areas, allowing for each space […]
ARH Joe Craft Tower Expansion

The $47 million expansion to Appalachian Regional Healthcare facilities offers residents of Perry and surrounding counties access to the largest medical center in southeast Kentucky. STW completed the full engineering design and construction administration for the 100,000 sq. ft. addition. The addition includes a new Emergency Department, a 16-bed Critical Care Unit, and a 34-bed acute […]
ARH Highlands Operating Room Renovation

STW engineered the complete replacement of the HVAC equipment serving the OR suite at the facility. The renovated HVAC system allows the entire suite to be serviced by a single central unit, providing uniform cooling and heating throughout. The facility was also fitted with new variable-air-volume (VAV) boxes serving OR rooms and support spaces, allowing […]