FCPS Russell Cave Warehouse
Shrout Tate Wilson Engineers provided mechanical, plumbing, and electrical design for the renovation of an existing one-story warehouse. The original building was transformed into FCPS’ central supply warehouse with supporting offices, administrative areas, and the district’s main IT/data center. This project included site lighting, a variable refrigerant HVAC system, all-electric power, and modifications to a […]
The Hub for Innovative Learning and Leadership
The HILL is a 172,000-square-foot adaptive reuse project in downtown Lexington. This building will consolidate the Southside and Eastside technical centers into one location. The HVAC systems utilize (200) two hundred, 500’ geothermal vertical bores tied into a central station dedicated outside air units with demand control ventilation and variable speed water source heat pumps. […]
Coventry Oak Elementary School
Named from two important neighborhoods in northwest Lexington – Coventry and Oakwood – Coventry Oak Elementary is one of two new elementary schools that opened in 2016 for Fayette County Public Schools. The one-story school provides educational space for 650 students within a 74,000 square-foot footprint. The building houses 40 classrooms, two computer labs, a gymnasium, […]
Cathedral of Christ the King Rectory and Adoration Chapel
The 2,800 sq. ft. Adoration Chapel and 5,200 sq. ft. Rectory were a nearly $5,000,000 addition to the Cathedral of Christ the King in Lexington, KY. The 2013 project seamlessly integrated the new additions with the original 1967 church landscape. The changes to the church’s campus upheld the original architectural integrity and honored the traditions of Catholicism. […]
Julie Frazier
Dwayne Ellison
David Epperson, PE
Brendan Corley
Brandon Cecil
Joshua Cairell