This new facility consists of six classrooms, an open office area, an administrative area, a locker room, a vehicle maintenance bay, a multipurpose room, a training device simulation room, a heated storage unit, a fitness room, vaults, and a commercial kitchen.
STW was responsible for designing all plumbing, fire protection, mechanical, and electrical systems for the project. HVAC systems include 2-stage geothermal water-source heat pumps, variable-speed pumping energy recovery units, electric unit heaters, and a DDC energy management system. Key electrical systems included switchboards and panelboards; general building lighting; emergency and egress lighting; general power and technology power wiring; power distribution to building equipment; fire alarm, intercom, time control, public address systems; and telecommunication/network wiring and raceway systems.