The Little Sandy Correctional Complex project involved constructing two new housing buildings, GC and GD, each containing four 104-bed units (208 beds per building). Based on a 2008 DLR design, the buildings were updated to improve efficiency, comply with modern standards, and support both medium- and maximum-security requirements, including mental health housing.
Mechanical systems included a Geothermal Water Source Heat Pump System with 104 vertical wells, smoke-evacuation fans where required, and Direct Digital Controls integrated with the facility’s secure-area ventilation system.
Emergency power was provided by two 900 kW diesel generators with a 7-day fuel supply. Energy-efficient LED lighting, security-rated fixtures, and stainless-steel fixtures in wet areas were installed throughout.
An addressable fire alarm system integrated into the existing facility network provided alarm monitoring, fire suppression supervision, and audio/visual notification capabilities in common areas.